Design And Construction Of Tunnels In Ethiopia Lessons Learned From The Case Of Gilgel Gibe Iii Hydropower Tunnels

Railway Engineering Project Topics

Get the Complete Project Materials Now! ยป

Tunnels are long linear undertakings with few opportunities to perform the work at more thanrnone location. Tunnels are also a series of repetitive operations each of which usually must bernfinished before the next can be started. Tunnel engineering makes possible many vitalrnunderwater and underground facilities. Unique design and construction techniques are involvedrnbecause of the necessity of protecting the constructors and users of these facilities from alienrnenvironments.rnIn Ethiopia, tunnelling has been recently practiced only for one of the utility tunnels, i.e.,rnhydropower tunnels. The purpose of this research is to evaluate the design and constructionrnapproaches of the GG III hydropower tunnels, and to generate lessons which could be appliedrnfor proper design and construction for future tunnels in Ethiopia. To achieve the objectives,rnefforts were made to evaluate the design and construction approaches, including literaturernreview, geological, hydrogeological and geotechnical investigation reports, design reports,rnmethod statements, various pictures and drawings, challenges and remedial work reports, siternvisit and interviews.rnIn this research the author has found design and construction problems related to the appliedrnrock mass classification system. The problems in the design include: using inappropriate GSIrnvalues which lead to uneconomical primary support design and inconsideration of stand-up timern(one of the design parameters). The problems in the construction include: using incorrectrnconstruction procedures of NATM, installation of improper ground excavation supports, and norninstallation of instrumentations and drainage holes (in the diversion tunnels). Due to thesernproblems, rock and shotcrete wedges failure occurred at various locations of power andrndiversion tunnels, and a tunnel section collapsed in the central diversion tunnel. A worker hasrnbeen lost due to the rock wedges failure in the manifold of the right power tunnel. Due to therncollapsed tunnel section, the unexpected quantity and various types of rock supports, groundrnimprovement materials, various construction techniques, a construction of additional 63.25mrnaccess tunnel (adit), etc. are used in the remedial works. The remedial works took almost ninernmonths, from May 2007 to February 2008. As a result of this collapsed section, the constructionrncost and the construction time of the project obviously increased.rnDue to lack of proper design of the primary supports in the project, the author has performed thernproper design of ground excavation primary supports using up-to-date Q-support design method.

Subsurface Intelligence & Critical Mineral Exploration

Modern Geology projects now focus on Machine Learning in Mineral Targeting, Carbon Capture & Storage (CCS) Geologic Modeling, and Critical Mineral Systems (Lithium, REEs). If your research involves Hydrogeological Connectivity, Seismic Inversion, or Geotechnical Site Characterization, ensure your analysis follows the JORC or NI 43-101 reporting standards and utilizes robust 3D Subsurface Visualization and Geochemical Fingerprinting frameworks.

Get Full Work

Report copyright infringement or plagiarism

Be the First to Share On Social



1GB data
1GB data

RELATED TOPICS

1GB data
1GB data
Design And Construction Of Tunnels In Ethiopia Lessons Learned From The Case Of Gilgel Gibe Iii Hydropower Tunnels

426