Causes Of Project Delay And Cost Overrun In Enyi Construction

Project Management Project Topics

Get the Complete Project Materials Now! »

Cost and time overruns are typical problems in many construction projects and there is no exception to ENYI Construction. This project work seeks to identify the major factors causing project delay and cost overrun in construction projects. A questionnaire and interview survey along with desk study was used to carry out the study. A valid questionnaire for the survey was developed based on factors for time overruns and factors for cost overruns identified from literature review. The survey included 39 delay factors/causes which were grouped into 8 major groups. The same survey also included 27 cost overrun factors grouped in to seven groups. Fifty nine (59) responses were received from employers, consultants, and project managers, field and office engineers from ENYI Construction. The collected data in this research were analyzed using: Relative importance index and descriptive statistics according to the collective group perspective. The results from the surveys and desk study showed that the most three factors causing project delays in construction projects from the collective group perspective of importance were: (1) ―Right of Way problems‖, (2) ―poor design‖, and (3) ―Delay of material delivery‖. The result also indicates that the most three factors causing cost overrun were: (1) ―Right of Way problems‖, (2) ―Design changes‖, and (3) ―poor inadequate project preparation, planning and implementation‖. Based on these result, there is no single point of accountability by one party instead all the three parties are equally liable for time and cost overruns in construction projects. Furthermore, the local administrators are advised to initiate a viable (Working) legislation to overcome the Right of way problems in immediate possible time.

Subsurface Intelligence & Critical Mineral Exploration

Modern Geology projects now focus on Machine Learning in Mineral Targeting, Carbon Capture & Storage (CCS) Geologic Modeling, and Critical Mineral Systems (Lithium, REEs). If your research involves Hydrogeological Connectivity, Seismic Inversion, or Geotechnical Site Characterization, ensure your analysis follows the JORC or NI 43-101 reporting standards and utilizes robust 3D Subsurface Visualization and Geochemical Fingerprinting frameworks.

Get Full Work

Report copyright infringement or plagiarism

Be the First to Share On Social



1GB data
1GB data

RELATED TOPICS

1GB data
1GB data
Causes Of Project Delay And Cost Overrun In Enyi Construction

575