Assessment Of Road Project Delay Factors (case Study Of Addis Ababa Road Authority) Project Work

Project Management Project Topics

Get the Complete Project Materials Now! »

Many road construction projects have been undertaking in Addis Ababa city and in these constructions it is becoming common experiencing a project delay problem in road construction projects. This project time delays usually lead to adverse effects on the growth of national economies, contribute to major financial losses, and hold back the development of the Addis Ababa city Therefore, it is essential to study and analyse causes of road construction project time delays. This paper studied a list of road construction delay causes (74 factors) gathered from literature having different types of construction, different countries, different periods and different numbers of delay causes. The questionnaire survey was distributed to 120 participants (clients, contractors, and consultants) and 83 were collected. Relative Importance Index (RII) was calculated and accordingly the top twenty and the least twenty delay causes of construction projects have been identified. A case study on two projects have been analysed and identified a common factor for project time delay. From the overall relative importance index analysis, most critical factors of road construction delay have been identified as (1) Slow land expropriation due to resistance from occupants / Slow site clearance; (2) Delays in contractor’s progress payment by owner; (3) Shortage of materials/Equipment’s on site; (4) Difficulties in financing the project by contractor; (5) Delay to deliver the site among the top five factors contributing to road construction project time delay in the city. Spearman ranking correlation coefficient has been employed to test the agreement level of the project parties on the identified delay factors and accordingly the test results reveal good agreement on the causes between owners and consultant has been revealed and a somewhat low correlation between contractors and with both owner and consultants In order to optimally overcome the road construction delays in the city, a recommendations partiilalry a strategic planning integrations in order to overcome the impact of dependency from different parties are forwarded.

Subsurface Intelligence & Critical Mineral Exploration

Modern Geology projects now focus on Machine Learning in Mineral Targeting, Carbon Capture & Storage (CCS) Geologic Modeling, and Critical Mineral Systems (Lithium, REEs). If your research involves Hydrogeological Connectivity, Seismic Inversion, or Geotechnical Site Characterization, ensure your analysis follows the JORC or NI 43-101 reporting standards and utilizes robust 3D Subsurface Visualization and Geochemical Fingerprinting frameworks.

Get Full Work

Report copyright infringement or plagiarism

Be the First to Share On Social



1GB data
1GB data

RELATED TOPICS

1GB data
1GB data
Assessment Of Road Project Delay Factors  (case Study Of Addis Ababa Road Authority)  Project Work

537